What you need to know for activities on or near a council road
If you are planning any activity on a road or road reserve, you must ensure it is carried out safely for all road users – including motorists, pedestrians, cyclists and contractors.
Permits required
- Corridor Access Request (CAR)
- Traffic Management Plan (TMP)
These must be submitted to Hurunui District Council for approval before any work begins.
What is the road corridor?
The road corridor is the area from the private property boundary on one side to the property boundary on the opposite side. This includes:
- The carriageway (road surface)
- The berm (grass verge)
- Footpaths
- The road reserve
Development Engineering Standards (DES)
The Hurunui District Development Engineering Standards (DES) provides developers and contractors with clear guidance on how to meet engineering-related resource consent conditions.
This document:
- Sets out minimum information requirements, procedures, and standards.
- Ensures that infrastructure is designed and constructed to a robust standard, allowing it to be vested as a Council asset.
What's under the ground - BeforeUDig
beforeUdig is a free online service that provides information about the location of cables, pipes, and other underground utility assets.
If you are planning any excavation work, using beforeUdig helps you:
- Identify underground infrastructure near your dig site
- Avoid damaging essential services
- Keep yourself and others safe during works
Check before you dig to protect valuable assets and prevent costly repairs.
Permissions and processes - CARs and WAPs
If your activity involves working in, on, or under the road corridor:
- You must submit a Corridor Access Request (CAR)
- A Traffic Management Plan (TMP) is also required as part of your CAR application
Note: Your activity may also require a Building or Resource Consent. Contact our Building or Planning teams to confirm.
For a full overview, see our User Guide to Submitica if you are planning any activity in, on, or under the road corridor, you must get the appropriate approvals to ensure the safety of:
- Contractors working onsite
- Motorists
- Pedestrians
- Cyclists
Required permits
Corridor Access Request (CAR)
A CAR is required for any works that impact the road corridor.
Traffic Management Plan (TMP)
A TMP ensures suitable traffic controls are in place to keep everyone safe during the activity.
Both applications must be submitted to Hurunui District Council for approval before any work begins.
Additional consents
Note: Your activity may also require a Building or Resource Consent. Please contact our office to discuss this with our Building or Planning teams.
- Apply
- Submit a Corridor Access Request (CAR) through BeforeUDig.
- Include a Traffic Management Plan (TMP) and all supporting documents.
- Process
- Council reviews your application. Processing may take 5–15 working days as approvals and conditions are set.
- Review
- The CAR and work conditions are forwarded to the Traffic Management Coordinator for final review.
- Approve
- Once approved, a Works Access Permit (WAP) is issued and emailed to you with conditions attached.
No work may begin without an approved WAP.
- Once approved, a Works Access Permit (WAP) is issued and emailed to you with conditions attached.
- Completion
- When your work is finished, notify Council via the works completion function in Submitica.
- Warranty
- You are responsible for any
defects in the work site for 24 months after completion.
The warranty period begins only after Council staff have signed off the completed works.
- You are responsible for any
defects in the work site for 24 months after completion.
Traffic Management Plan (TMP)
A Traffic Management Plan (TMP) is required for any activity that alters the normal operating conditions of a road, including:
- Work on the carriageway, footpath, or road shoulder.
- Activities outside the road reserve that impact traffic flow or road user safety.
Key requirements
Qualified design
- TMPs must be designed by a suitably qualified person.
- From 1 May 2021, TMP designers must:
- Hold a Temporary Traffic Management Planner (TTMP) warrant, or
- Have the appropriate current NZQA qualification.
Standards
- TMPs must meet the minimum standards outlined in the NZ Guide to Temporary Traffic Management.Hurunui District Council currently accepts :
- The NZ Guide.
Submission process
- All TMPs must be submitted via Submitica for review and approval.
Submit your TMP through Submitica.
TMP extension request
Sometimes work is delayed for various reasons, and the approved dates on your Traffic Management Plan (TMP) need to be extended.
To request an extension:
- Complete the TMP Extension Request Form
- Submit the form for Council approval before your current TMP expires.
Work cannot continue past the original approval dates without an approved extension.
Road Space Bookings (RSB)
Road Space bookings are for non-excavation work sites only.
Road Space Bookings are for non-excavation work sites only and are available to holders of an approved, current, Generic Traffic Management Plan (GTMP).
When to use the RSB process
- For smaller, non-excavation sites only
- All other sites require a site-specific TMP, submitted via Submitica
Application process
- Complete the online RSB application form before any work begins
- Submit your RSB at least five (5) working days prior to the planned start date
- Upload your specific intended UTMD plan with your application. (please do not submit your entire GTMP)
Events and a Road Closure
If you are planning an event on the road corridor or next to the road corridor that will alter the normal operating conditions of the road, you must submit a Traffic Management Plan (TMP) for approval.
Submit your application well in advance of the proposed event date to allow time for public notifications and the full Council approval process.
Late applications may not be accepted.
This process ensures the safety of:
- Event participants
- Road users (motorists, cyclists, pedestrians)
- Contractors and staff managing the event
Learn more: Running an Event in the Hurunui District - What You Need to Know
Events Requiring a Full Road Closure
Events Requiring a Full Road Closure
If your event requires a full road closure, there are additional steps and legal requirements to follow:
Submit a Temporary road closure application:
- Include your proposed Traffic Management Plan (TMP) with the application.
- Applications must be submitted well in advance to allow time for public notification and approvals.
Pay a Bond:
- A bond is required for all road closures.
- Refer to Council’s current Fees & Charges for details.
- All costs associated with processing the application (including public notice advertising) will be deducted from the bond.
Public Notification:
Initial Notice:
- Council is legally required to advertise the proposed closure in
- The Public Notices section of the local newspaper/newsletters
- Council’s social media channels
- Other appropriate platforms as required
This notice invites the public to submit any reasonable objections within a 1-week objection period.
Final Notice:
- If approved, a second notice is published following the Committee’s decision.
- The cost of these notices will be deducted from the deposited bond.
No work or event activity may proceed until the road closure has been formally approved and all notices have been published.
Conditions:
All costs will be deducted prior to any bond refund to the applicant.
All costs for remedial grading, road furniture replacement and/or metaling, as determined by the Council Roading staff, will be deducted prior to any bond refund to the applicant.
All major damage recoveries will be deducted from the applicants own public liability insurance.
The remainder of the bond will only be refunded once the road has been inspected and all repairs (if any) have been made.
The applicant is bound by any and all conditions as stated by The Council.
In the event that the closure is cancelled, the applicant is still liable for all costs incurred, including officer time.
The Council reserves the ‘right of refusal’ of any application lodged with reasonable explanation.
Processing Timeframes
Submitting complete and thorough applications with an appropriate lead-time is an important part of making sure an activity goes ahead as planned. While we reference minimum lead-times, we strongly encourage that people involved in this process plan for larger lead-times which should account for any unexpected delays in approval e.g. coordination with other contractor approvals.
The timeframes below are minimum lead/processing times.
| APPLICATION | MINIMUM TIMEFRAME |
|---|---|
| Standard CAR or TMP | 5 working days |
Non-event Road Closure TMP | 10 working days** |
Event Road Closure TMP | 42 working days *** |
** This allows for 5 working days to process the TMP and 5 working days to establish the static warning signs.
*** Statutory requirement for public advertising. This also allows time for public feedback and consideration by Council at the next available meeting.
Licence to Occupy Road Reserve
Privately owned structures that encroach on or under Council roads require an agreement to occupy between the owner of the structure and the Hurunui District Council - being the owner of the road reserve. .
If you own any type of improvement that encroaches on a Council road (whether formed or unformed) you are required to enter into an agreement with the Council. This licence is not transferable.
Improvements may be structures that are partially or fully above ground, or they may be partially or fully below ground as infrastructure, such as pipes. If these improvements intrude onto or under the road, they are called encroachments and a Licence to Occupy is required.
As part of this process, full details of the extent and nature of the encroachment must be supplied with the application.
Fees:
- An application fee (incl. GST) is payable with the application. This fee is non-refundable. it is advised that you speak to council, to discuss your proposal, before applying.
- Other fees and rentals: Further fees may payable if the application proceeds if council inspection is required.
- Annual rent may be payable as part of any agreement.
The road corridor (road or road reserve) is defined as the area from the private property boundary on one side to the property boundary on the other. This includes the berm (grass verge), footpath and carriageway.
Traffic Management Plan
As a requirement of the Health and Safety at Work Act 2015, the Local Government Act 1974 and 2002, and the Land Transport Management Act 2003, the applicant and or their contractors will need an approved Traffic Management Plan (TMP) detailing traffic control works prior to any of the works commencing on, or in, the road reserve. This must be completed by a qualified Site Traffic Management Planner and appropriately qualified onsite staff.
As Built Plans on Completion of Work
An electronic set of plans to be provided of each set of assets installed comprising drawings at a recognised scale. The plans shall be certified by the Consultant or Contractor overseeing the work stating that they are a true and accurate record of all services. Furthermore, where plans have been prepared using CAD techniques a copy of the electronic file shall be provided in either AutoCAD LT format (.dwg or .dxf).
As built plans of the following are required in electronic file format
Water plan - showing the location of connection points, tanks and associated reticulation relative to boundaries. Finished cover levels at valves and hydrants shall be shown. Pipe size, material and pipe class shall also be shown.
Sewer plan - showing the location of manholes and lateral positions relative to boundaries.
All cover and invert levels for all manholes and inspection chambers (proposed as vested to council) will be provided. Pipe size, material and gradient should also be shown.
All electronic drawings will be provided to NZTM2000 projection with levels to NZGD2000 Datum. If drainage (WW or SW) is discharging into a council owned asset then that council-owned asset should be included as part of the survey.
The supervising engineer will be required to issue a producer statement confirming that all the works have been carried out installed and completed to the standards and specifications of the approved documents.
Locate Underground Services
Apply to www.beforeudig.co.nz for service plans |
Grass Berms
Grass berm areas that are disturbed shall be formed on good quality top soil to a depth of at least 75mm below the finished surface. The area shall be rolled, raked and graded to an even surface, with the seed sown evenly over the area at a rate of 30 grams grass seed /sq metre. The seed shall consist of:
Chewings Fescue ‘Dawson Red’
70% Brown Top NZ Certified 30%
The grass seed shall then be lightly raked into the surface, lightly rolled and watered as required. The applicant’s attention is drawn to the need for watering during dry periods to establish a good ‘strike’ of the seed.
Temporary Fences
Temporary fences must also comply with section 8. ROADSIDE FENCING of the Hurunui District Public Places Bylaw, (2014)
Activities on Road Reserve
To carry out an activity on/under or over the road reserve, you may need to apply for a licence. This ensures the safety of all road users and protects public infrastructure.
Erect Fencing
Permanent Fences:
- Licence to occupy would be required to erect a permanent fence on the road reserve and to occupy that area of land.
- Temporary Fences: It is possible that no licence is required for a temporary fence for grazing the 'long acre' under the conditions as set out in Section 8. of the Public Places Bylaw 2014.
Council Guidelines for Grazing Stock on Road Frontage also known as "the long acre
- Public Places Bylaw 2014 refer section 8
- search for other acts this falls under.
When grazing stock for safety of the traveling public and safety for your stock, there are key guidelines that need to be followed.
General Permissions
Public Safety:
- Stock wandering onto roads pose a safety risk to both drivers and animals. Ensuring adequate fencing is crucial.
- Grazing is typically allowed only along your own property frontage.
- If grazing along someone else’s frontage, written permission from the landowner must be provided to the council.
Fencing and Containment - Section 8 Public Places Bylaw
- Stock must be safely fenced or tethered to prevent them from wandering onto the road.
- Fencing should be secure and well-maintained, especially near high-speed roads.
- Temporary fences must be used, set back from the road edge, and constructed with materials that minimize harm to road users.
- Temporary fences should be strategically placed and maintained to prevent animals from accessing the road.
Distance from Road Verge
- Stock should be kept well clear of the carriageway (the part of the road used by vehicles).
- Grazing should occur on the berm or road reserve, not on the shoulder or carriageway.
Hours of Darkness
- Grazing is not permitted during hours of darkness, defined as: Half an hour after sunset to half an hour before sunrise.
- This is to ensure visibility and safety for both stock and road users.
Damage to Infrastructure:
- Stockowners are generally liable for damage to road surfaces, drainage systems, and other infrastructure caused by their animals.
Liability:
- Owners are responsible for ensuring their animals are contained and for any damage they cause, including accidents.
Soil Erosion:
- Overgrazing or grazing on unsuitable surfaces can lead to soil erosion and loss of vegetation cover.
Monitoring:
- Regularly inspect the grazed area and address any issues like erosion or damage to infrastructure.
Installing pipes or cables across road reserve
For activities in/under or over the road reserve you will require a licence to Occupy
Backfilling to subgrade level in roads, right of ways, vehicle crossings, carparks and private driveways shall be with hardfill, placed and compacted in 200mm maximum layers. AP65 will be acceptable as hardfill backfill. Use of river or pit run for subgrade improvements is subject to specific Council approval, and will only be approved if its larger particles are not excessively sized and it contains sufficient broken faces and fines.
Compaction
Compaction testing shall be under taken using a Clegg Hammer at maximum 10m spacings on each 200mm layer. The backfill layers shall have a minimum impact value of 25. this test will be undertaken by appointed council staff and an inspection fee may apply.
As Built Plans
An electronic set of plans to be provided of each set of assets installed comprising drawings at a recognised scale. The plans shall be certified by the Consultant or Contractor overseeing the work stating that they are a true and accurate record of all services. Furthermore, where plans have been prepared using CAD techniques a copy of the electronic file shall be provided in either AutoCAD LT format (.dwg or .dxf).
Traffic Management Plan
As a requirement of the Health and Safety at Work Act 2015, the Local Government Act 1974 and 2002, and the Land Transport Management Act 2003, the applicant and or their contractors will need an approved Traffic Management Plan (TMP) detailing traffic control works prior to any of the works commencing on, or in, the road reserve. This must be prepared in accordance with the NZ Guide.
Planting on road reserves - trees, hedges, shrubs and shelter belts
General Principles
- Trees and hedges can enhance property aesthetics, provide shelter, and improve privacy.
- However, poorly planned or maintained vegetation on road reserves can create hazards for road users, including:
- Obstructed visibility
- Damage to vehicles or infrastructure
- Risk of injury or fatalityLegal Requirements
- A Licence to Occupy is mandatoryfor any planting on road reserves.
- This licence ensures that the planting is approved and managed according to council standards.
- Unauthorised plantings must be removed at the expense of the person who planted them. The ground must also be restored to its original condition
Road Signs
- Regulatory Signs to advise drivers of restrictions such as speed limit signs, stop signs, and parking restriction signs
- Permanent Warning Signs (yellow) to indicate the presence of road hazards such as curve warning signs, speed hump signs, and “slippery when wet” signs
- Temporary Warning Signs (orange) to indicate hazards of a temporary nature such as road works signs, loose metal signs, and lane closure signs Street name signs (blue) are provided to indicate the names of streets. Their best use is in providing assistance to road users who are unfamiliar with the area and are trying to confirm road names when following a map or route instructions. The numbers on the signs are RAPID numbers to indicate the addresses of private properties.
- Guide Signs (green) provide directional information as well as information such as distance.
- Amenity signs (Tourist brown; motorist services blue) supplement street name signs to assist in locating a particular facility. The use of amenity signs is carefully managed to provide additional assistance to road users where warranted, while avoiding the proliferation of large numbers of signs.
Storage on Road Reserve
Storage on Road Reserve
Storing materials such as stock feed, logs, machinery or other items on the road reserve creates serious safety hazards.
- It restricts visibility for road users.
- It obstructs pedestrians, forcing them to walk on the road.
- Cyclists and horse riders are unable to move safely to the side.
- Passing vehicles are forced into oncoming traffic to navigate around the obstruction.
In addition, tractors or machinery moving feed or logs in winter can:
- Cause significant damage to road drainage systems.
- Leave clods of earth and debris on the road, creating further hazards for traffic.
Council does not permit storage on the road reserve.
Structures on Road Reserve
Structures On Road Reserve
If you wish to:
- Erect a structure or
- Develop a parking area on the road reserve in front of your property,
you must first apply for a Licence to Occupy.